WORK PLAN

Table below shows the Gantt chart which is the overall planning for the preparation of Meter Bill for Distribution Panel. The time frame allocated for this research study is 4 months. It is started in September 2014 and will be completed in December 2014. It is divided into 14 weeks. The Gantt chart for this project is shown in Table.
The chart is divided into 13 tasks to achieve the project objectives. Each task will follow the sequence form week to week. Based on the chart, the most challenging task is making a research about EMG signals and components to be used in this project. It needs more time to find and survey suitable components and material that going to be used for the project.
Besides, the designing of flow chart of the product and the block diagram are also a challenging task during conducting this research. It needs more understanding on how the system work as the block diagram is easier for drafting the exact situation of how the system works.